Production & Testing

All our castings are sourced from our foundry after which they are machined at one of our machine shops. Our sub-assembly sections put together various parts of the pump which are passed onto our main assembly line where they are assembled into the final product along with the engine.

All the above procedures are subject to continuous tight quality control as required by ISO 9001:2008, the prevailing quality control standard within the company. On completion of the assembly, the pumps are moved to our modern testing facility where they undergo testing for a 24-hour period.Thereafter they are taken to our paint shop for painting and final packaging.